Would you like to visit another country's site?

BOM (Bill of Materials) ECOUNT's production management program can automatically calculate
the quantity of raw/sub materials required for production based on the BOM (Bill of Material).

Production Inventory
Management Utilizing BOM

  • You can configure the quantity of raw and subsidiary
    materials required for product manufacturing
    using the BOM (Bill of Materials).
  • Based on the BOM, the system automatically calculates
    the types and quantities of raw /sub materials to be used
    in production.
  • As production receipts are entered, inventory is
    updated in real time, eliminating the need for separate
    production inventory management.
Production Inventory Management Utilizing BOM Production Inventory Management Utilizing BOM

Apply Your Company's BOM Structure

  • You can register multiple processes to match your company's production flow.
  • BOMs can be configured using various units such as EA, SET, KG, and more.
  • With the Excel upload feature, you can easily upload large volumes of BOM data.
Apply Your Company's BOM Structure

Smooth Ordering of Raw/Sub Materials Without Distrupting
the Production Schedule

  • You can forecast the quantity of raw and subsidiary materials required for production in advance based on the BOM.
  • By pre-calculating the required raw/sub materials, you can place them in your purchase order ahead of time
Smooth Ordering of Raw/Sub Materials Without Distrupting the Production Schedule Smooth Ordering of Raw/Sub Materials Without Distrupting the Production Schedule

Comparison of BOM-Based Consumption and
Actual Consumption at a Glance

  • When entering production, you can apply the actual quantity of raw and subsidiary materials consumed on site.
  • You can check the difference between the set BOM and the actual materials used.
  • Compare costs based on actual consumption and BOM standards.
Compare BOM-Based and Actual Consumption Quantities at a Glance