BOM (Bill of Materials)
ECOUNT's production management program can automatically calculate
the quantity of raw/sub materials required for production based on the BOM (Bill of Material).
Production Inventory
Management Utilizing BOM
- You can configure the quantity of raw and subsidiary
materials required for product manufacturing
using the BOM (Bill of Materials). - Based on the BOM, the system automatically calculates
the types and quantities of raw /sub materials to be used
in production. - As production receipts are entered, inventory is
updated in real time, eliminating the need for separate
production inventory management.
Apply Your Company's BOM Structure
- You can register multiple processes to match your company's production flow.
- BOMs can be configured using various units such as EA, SET, KG, and more.
- With the Excel upload feature, you can easily upload large volumes of BOM data.
Smooth Ordering of Raw/Sub Materials Without Distrupting
the Production Schedule
- You can forecast the quantity of raw and subsidiary materials required for production in advance based on the BOM.
- By pre-calculating the required raw/sub materials, you can place them in your purchase order ahead of time
Comparison of BOM-Based Consumption and
Actual Consumption at a Glance
- When entering production, you can apply the actual quantity of raw and subsidiary materials consumed on site.
- You can check the difference between the set BOM and the actual materials used.
- Compare costs based on actual consumption and BOM standards.