MRP (Material Requirements Planning) By utilizing the MRP function, you can establish a material requirements plan to ensure that raw/sub materials are not in short supply.
This enables you to order the appropriate quantities necessary for production.

Material Requirements Planning (MRP) Linked with
Master Production Schedule (MPS)

  • Based on the production schedule established through the Master Production Schedule (MPS),
    you can procure the raw/sub materials required for production.
  • Even without manual calculations, the Material Requirements Planning (MRP)
    is automatically established based on the production plan.
Material Requirements Planning (MRP) Linked with Master Production Schedule (MPS)

Establish a Systematic
Ordering Process through
Automatic Calculation

  • Based on the BOM, you can flexibly apply safety stock,
    lead time, holidays, etc., to determine the timing
    and quantity for procuring raw/subs materials.
  • The required quantity, expected receipt quantity,
    and necessary quantity of raw/sub materials for each
    date to be used in production are automatically calculated.
  • Based on the derived material requirements plan,
    the purchase plan is automatically established, and you
    can instantly generate purchase orders by linking
    with the purchase plan.
Establish a Systematic Ordering Process through Automatic Calculation